MISR-CANADA Luble-oil Plant 10th RAMADAN
Owner: | Misr Canada Oils |
Main Contractor: | M.C.L. |
Quantity: | 700 Ton Steel, 2000 M Piping, 100 Ton Stairs, 300 M Grating. |
Execution Period: | Seven months - 1999. |
Description
ARCONS Scope of work Erection 27 tank with different diameter with piping, pumps, sandblasting and panting.
ARCONS Scope of work Erection 27 tank with different diameter with piping, pumps, sandblasting and panting.
Share
- Tags
- Luble OilMCLMisr Canada
- Client
- M.C.L.
- Release Date
- 1999