Air Traffic Control Tower
Owner: | Government of Libya. |
Main Contractor: | Vinci /OEA |
Quantity: | 300 Ton |
Execution Period: | 2 Months 2009 |
Description
Design, fabrication and manufacture of the steel structure at Tripoli International Airport Project, Air Traffic Control Tower.
Design, fabrication and manufacture of the steel structure at Tripoli International Airport Project, Air Traffic Control Tower.
Share
- Tags
- Air Traffic Control TowerAirportLibyaTripoli
- Client
- Vinci /OEA
- Release Date
- 2009