![](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img,w_507,h_380/https://arconsegypt.com/wp-content/uploads/2021/05/m103.jpg)
New Naga Hammadi Barrage and Hydropower plant
Owner: | Ministry of Irrigation and Water Resources. |
Main Contractor: | D.S.D - NOELL. |
Quantity: | 4400 ton. |
Execution Period: | 11 months - 2006. |
Description
ARCONS Scope of work Installation of powerhouse, navigation locks and sluice way.
ARCONS Scope of work Installation of powerhouse, navigation locks and sluice way.
Share
- Tags
- Hydropower plantNaga Hammadi Barragepowerhouse
- Client
- D.S.D - NOELL.
- Release Date
- 2006