Alex. Mineral-oil Plant AMOC
Owner: | AMOC |
Main Contractor: | Foster Wheeler France |
Quantity: | 850 Ton Steel, 2400 M Piping, 120 Ton Stairs, 400 M Grating. |
Execution Period: | 12 Months - 2000:2001 |
Description
ARCONS Scope of work Erection 40 tank with different diameter from 6-24m with piping, pumps, sandblasting and panting.
ARCONS Scope of work Erection 40 tank with different diameter from 6-24m with piping, pumps, sandblasting and panting.