Port of Sokhna Container Terminal
Owner: | Port of shokhna |
Main Contractor: | China Harbor Engineering Co. |
Quantity: | 850 TON |
Execution Period: | three months - 2018. |
Description
ARCONS Scope of work Supply, Fabrication, painting and transportation to job site for black carbon steel (formwork, Sea side formwork, stow pin, Storm tie-down, Buffer stoppers, truss, Rail beam formwork).
ARCONS Scope of work Supply, Fabrication, painting and transportation to job site for black carbon steel (formwork, Sea side formwork, stow pin, Storm tie-down, Buffer stoppers, truss, Rail beam formwork).