Angola Generation Project

Owner: Angola Ministry of Energy and Water. Main Contractor: El Sewedy Electric Transmission & Distribution Quantity: 6 Tanks Execution Period: 4 Months from 3/2017 to 6/2017 Description: Supply, fabrication, surface treatment, Inspection, sandblasting, guarantee, and tests based on FCA Seller’s warehouse, installation, painting based on buyers’ sites Angola.