TB2 Cairo International Airport

Owner: Cairo Airport
Main Contractor: NSF
Quantity: 3723 Ton
Execution Period: 6 Months 12/2013 - 5/2014
Description

Erection of structural steel of Building A sheer and baggage Handling system Bridge, external shed of terminal building No.2, sky wall and skyway strengthening steel works- level 19.700

Photo Gallery

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.