Owner: UEEPC (Upper Egypt Electricity Production Company).
Main Contractor: CMI - PGESCo.
Quantity: 625 Ton, 24 Pieces Module, HP,LP,IP Drums.
Execution Period: 16 Months 2009-2010
Description

ARCONS Scope of work Installation of Boiler 3 & boiler 4 (Steel Structure, Modules, Stacks)at KURIMAT III (2*750MW) Combined Cycle Power Plant.