Angola Generation Project

Angola Generation Project

Owner: Angola Ministry of Energy and Water. Main Contractor: El Sewedy Electric Transmission & Distribution Quantity: 6 Tanks Execution Period: 4 Months from 3/2017 to 6/2017 Description: Supply, fabrication, surface treatment, Inspection, sandblasting, guarantee, and tests based on FCA Seller’s warehouse, installation, painting based on buyers’ sites Angola.

20 X TM2500+ Emergency Power Project

20 X TM2500+ Emergency Power Project

Owner: Egypt Ministry of Electricity & Energy Main Contractor: El Sewedy Electric & GE Packaged Power Quantity: 36 Tank 100m3 Execution Period: 2 Months 3/2015 – 5/2015 Description workshop drawings, supply, fabrication, surface treatment, Inspection, leakage testing, sandblasting, painting and tests, guarantee of 36 fuel storage tanks 100m3 based on Ex-work Seller’s warehouse.