Angola Generation Project

Owner: Angola Ministry of Energy and Water. Main Contractor: El Sewedy Electric Transmission & Distribution Quantity: 6 Tanks Execution Period: 4 Months from 3/2017 to 6/2017 Description: Supply, fabrication, surface treatment, Inspection, sandblasting, guarantee, and tests based on FCA Seller’s warehouse, installation, painting based on buyers’ sites Angola.

20 X TM2500+ Emergency Power Project

Owner: Egypt Ministry of Electricity & Energy Main Contractor: El Sewedy Electric & GE Packaged Power Quantity: 36 Tank 100m3 Execution Period: 2 Months 3/2015 – 5/2015 Description workshop drawings, supply, fabrication, surface treatment, Inspection, leakage testing, sandblasting, painting and tests, guarantee of 36 fuel storage tanks 100m3 based on Ex-work Seller’s warehouse.

Nubaria Power Plant I & II 2×750 MW CCP.

Owner: West Delta Electricity Production Company (WDEPC). Main Contractor: ALSTOM – DSD. Quantity: 4500 Ton Execution Period: 14 Months 1/2005 – 3/2006 Description ARCONS Scope of work Installation of Harps, Baffles, Inlet Duct, Oulet Duct, 4x HRSG, Casing and Steel Structure for 2×750 MW Combined Cycle Project. Photo Gallery