Burrulus Power Plant – HRSG

Owner: Egyptian Electricity Holding Company (EEHC) Main Contractor: IREM S.p.A. SA Ltd. / ORASCOM Quantity: 9,356 Ton Execution Period: 12 Months 10/2016 – 9/2017 Description: Installation of Steel Structure, Panels and Bundles, LP & HP Drums, Including Internal Piping works … etc. of 2 HRSG in Module 2 at BURULLUS 4800 MW Combined Cycle Power[…]

Burrulus Power Plant – Steel

Owner: Egyptian Electricity Holding Company (EEHC) Main Contractor: IMAGRO CONSTRUCTION S.r.l / ORASCOM Quantity: 2,240 Ton Steel 17,050 m2 Cladding Execution Period: 6 Months 10/2016 – 03/2017 Description: Erection of steel structure and cladding works of STG 1 & STG 3 at BURULLUS 4800 MW Combined Cycle Power Plant Project

Angola Generation Project

Owner: Angola Ministry of Energy and Water. Main Contractor: El Sewedy Electric Transmission & Distribution Quantity: 6 Tanks Execution Period: 4 Months from 3/2017 to 6/2017 Description: Supply, fabrication, surface treatment, Inspection, sandblasting, guarantee, and tests based on FCA Seller’s warehouse, installation, painting based on buyers’ sites Angola.

20 X TM2500+ Emergency Power Project

Owner: Egypt Ministry of Electricity & Energy Main Contractor: El Sewedy Electric & GE Packaged Power Quantity: 36 Tank 100m3 Execution Period: 2 Months 3/2015 – 5/2015 Description workshop drawings, supply, fabrication, surface treatment, Inspection, leakage testing, sandblasting, painting and tests, guarantee of 36 fuel storage tanks 100m3 based on Ex-work Seller’s warehouse.