20 X TM2500+ Emergency Power Project

Owner: Egypt Ministry of Electricity & Energy
Main Contractor: El Sewedy Electric & GE Packaged Power
Quantity: 36 Tank 100m3
Execution Period: 2 Months 3/2015 - 5/2015
Description

workshop drawings, supply, fabrication, surface treatment, Inspection, leakage testing, sandblasting, painting and tests, guarantee of 36 fuel storage tanks 100m3 based on Ex-work Seller's warehouse.

Photo Gallery

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.